I've been watching a guy on you tube name Evertt ( http://modelrr.oakviewresources.com/ ) who has about 60 videos showing how he makes his. (I've only watched about the first 10 or so, so far.)
If you have made you own, do you think you saved any real money? I mean over the long haul. One to One turnout, I can't see going through the process. But lets say you want/need 20 or more turnouts. Since I'm still in the armchair, errr design phase, I am thinking of going this route so I can at least feel like I'm doing something progressive.
If I do go this route, I'm thinking of going with #8 turnouts as a compromise between #6's and #10's. That is if I go with the Fast Tracks jig. If I use Evertt's. or anothers, method then maybe I will use anything from # 7's on up.
If you have made you own, do you think you saved any real money? I mean over the long haul. One to One turnout, I can't see going through the process. But lets say you want/need 20 or more turnouts. Since I'm still in the armchair, errr design phase, I am thinking of going this route so I can at least feel like I'm doing something progressive.
If I do go this route, I'm thinking of going with #8 turnouts as a compromise between #6's and #10's. That is if I go with the Fast Tracks jig. If I use Evertt's. or anothers, method then maybe I will use anything from # 7's on up.