OK, I have my benchwork done with 2 1/2" of foam on top of a 34" x 80" door. I have my track laid out full size on a sheet of paper. I have not made any commitmets regarding terrain yet, but again, I'm back to asking some basic questions.
From what I've read, a 2% grade would be ideal, and 3% would be pushing it. The layout is a modified Atlas N17, with less passing track and a few less sidings and so there is a figure eight that I want to use a bridge on. I also plan on having a road go underneath the tracks at one point. Now the questions: What is the minimum clearance from the top of the track to the bottom of the bridge that passes over it? What about a typical road underpass clearance? The grade I wind up with obviously depends on this clearance, plus I want it to look right.
Don
From what I've read, a 2% grade would be ideal, and 3% would be pushing it. The layout is a modified Atlas N17, with less passing track and a few less sidings and so there is a figure eight that I want to use a bridge on. I also plan on having a road go underneath the tracks at one point. Now the questions: What is the minimum clearance from the top of the track to the bottom of the bridge that passes over it? What about a typical road underpass clearance? The grade I wind up with obviously depends on this clearance, plus I want it to look right.

Don