Well - It's time to pick the dates for the next party - It's time for No. 5..
Another 6 week Gauge Layout party!!!
Another 6 week Gauge Layout party!!!
revandy said:I'm a newby, but went with the middle one, I figure by them the hubbub of the Holidays will be over, the wallet a little fatter, and it will give me the incentive to start the benchwork going!
RevAndy
Catt! said:Ok Mikey,here's my plan.
1. Get all the track that is already down wired up so I can at least run a train back and forth.
2. Once 1 is done I hope to get the track laid up to the proposed industrial park.
3. Get the HOn30 layout wired and in runable condition.
4. Scratchbuild some cars for the HOn30 railroad (am currently scratchbuilding a passenger coach right now).
There are other things on the list but I'll get these done before I worry about them.
By the way I will be starting on the layout on 1-9-05 irregardless of the actually party staring time.![]()