Gary is away from the computer for the week, so I am helping with this. He wants to finish his last table but is stuck on a track plan. Here is a quick idea of what he wants. This is a crude rough of what Gary was thinking of that I did in XTRK. Squares are 12". Table is already built.
The top track is where his bridge is. That has to stay 4" from the inside edge. The little box is a support beam, so that cannot be moved. He has a building that is 6' long and 4" deep that has to go somewhere. He needs an interchange that is at least 4 tracks and 5 to 6' feet long. Also requires a runaround that is about 6 to 7' long. Other than that, all bets are off.
On the small part of the L Gary was thinking of an urban setting with smaller industries, since most of his are pretty big. That seems to be where he is stuck. Oh yeah, Gary time frame is the 70s. Personally, I am thinking of putting a diesel service area in the smaller area. Any ideas would be greatly appreciated.
Loren

Gary is away from the computer for the week, so I am helping with this. He wants to finish his last table but is stuck on a track plan. Here is a quick idea of what he wants. This is a crude rough of what Gary was thinking of that I did in XTRK. Squares are 12". Table is already built.

The top track is where his bridge is. That has to stay 4" from the inside edge. The little box is a support beam, so that cannot be moved. He has a building that is 6' long and 4" deep that has to go somewhere. He needs an interchange that is at least 4 tracks and 5 to 6' feet long. Also requires a runaround that is about 6 to 7' long. Other than that, all bets are off.
On the small part of the L Gary was thinking of an urban setting with smaller industries, since most of his are pretty big. That seems to be where he is stuck. Oh yeah, Gary time frame is the 70s. Personally, I am thinking of putting a diesel service area in the smaller area. Any ideas would be greatly appreciated.