Alright, last few days have been busy. As I said, the basic yard scenery is up. Now i just need some more chain link fencing to go around the yard, and few extra gates, as well as some figures, and cars for the railroad workers. I'll probably be able to add some weeds and things eventually as well.
here is a picture of my yard all ballasted, and with the road to the office finished. as far as roads go, only the overpass that would b behind the camera is still giving me troubl, but i'll figure it out.
What other details should be added? anyone have any cool ideas?
Conrail SD40 6345 pulls this old GG1 to a mueseum.
the GG1 is a BLI locomotive, and the SD40 is kato. Detail parts for this locomotive are in the mail. The only detail i need to grab now are some eye bolts and apperently these units had the break wheel at the rear. I already installed sunshades. These 2 are my newest locomotives.
I plan on finally obtaining a GP40FH-2 shell and any parts ( like an extra athearn GP#-2 to power it) it needs before i go cold turkey on the locomotives. I have way to many! I plan on focusing my efforts on signaling, then ballasting and the rest of the details. Once the signals are installed, i'll order away for the catenary (Finally! i feel like i'm getting close to stringing wires!)