



I got the first wall up temporarily. It still needs windows and doors painted and installed. this back wall touches the wall of the rr room. it is such a tight fit there will be no room for battens, window trim, or a roof overhang; so the back side of the model will need to be redone if it ever survives this layout, and is not smack up against a back drop in it's next location. Since the outside of this wall is not visible the best side of each board went to the inside of this wall.
Next I will start to plank the front wall, and we will start to get an idea of how this building will look!
outside the leaves are starting to go, opening up my view a little, so I have included a picture of the RJ Corman Railroad's Cumberland River bridge on their Guthrie Ky. to Cumberland City TN. operation . I had to walk down my front yard some to get more than the the approach in the view. above the river crossing there is a through truss bridge out there hanging. It is a remnant of the old Tennessee Central. before the T C in Clarksville was scrapped I could see five or six railroad bridges from my front porch in the winter when the leaves were down.
Bill Nelson
Last edited: