Here's an example of some of the operation I've been trying to include while working on the layout. Even though trains run through unfinished areas or past half built buildings I wanted to be sure that the layout would remain interesting after it was all "done"
Here two gondolas loaded with steel coils are pulled out of the rolling mill by the Kings Port Steel Lil' Critter.
Here two gondolas loaded with steel coils are pulled out of the rolling mill by the Kings Port Steel Lil' Critter.