GOOD DAY TO ALL
I'M STARTING TO BUILD A LAYOUT UNDER A COFFEE TABLE THAT IS A 42" HEXAGON . I HAVE MOST OF THE LAYOUT ROUGHED IN . A MAIN LINE RUNS AROUND THE OUTSIDE THEN TURNSOUT INTO A HELIX THAT CLIMBS A GRADE OF 3% . AT THE TOP THERE IS A BRIDGE SPAN OF 13" THIS IS IN A CURVE AND OVER THE DECENDING TRACK.
THE BRIDGE IS THE PROBLEM BEING THAT IT IS CURVED I'M UNABLE TO FIND A UNIT BIG ENOUGH OR CURVED ( AT THIS TIME STICK BUILT IS OUT ? ) PLEASE HELP
THANKS JOHN
I'M STARTING TO BUILD A LAYOUT UNDER A COFFEE TABLE THAT IS A 42" HEXAGON . I HAVE MOST OF THE LAYOUT ROUGHED IN . A MAIN LINE RUNS AROUND THE OUTSIDE THEN TURNSOUT INTO A HELIX THAT CLIMBS A GRADE OF 3% . AT THE TOP THERE IS A BRIDGE SPAN OF 13" THIS IS IN A CURVE AND OVER THE DECENDING TRACK.
THE BRIDGE IS THE PROBLEM BEING THAT IT IS CURVED I'M UNABLE TO FIND A UNIT BIG ENOUGH OR CURVED ( AT THIS TIME STICK BUILT IS OUT ? ) PLEASE HELP

THANKS JOHN