I have planned a trestle with separate tracks in both directions. I have seen pictures of railroads doubling up tracks without having any switching or ability to change tracks for a narrower bridge. I think it would really look great to have a bridge track like this.
So... Can you buy the parts to make this or must it be hand-laid? If it has to be hand-laid would it be easier to use about 1/3 of a crossing at each end (throw away the center) and extend the tracks between the two pieces or to start from scratch?
I have never even considered doing hand-laid but there are first times for everything:thumb:

So... Can you buy the parts to make this or must it be hand-laid? If it has to be hand-laid would it be easier to use about 1/3 of a crossing at each end (throw away the center) and extend the tracks between the two pieces or to start from scratch?
I have never even considered doing hand-laid but there are first times for everything:thumb: