What would you guys suggest for bus gauges for this layout.
its a 4x8 layout and how many feet should I get? Also what gauge should I get (i assume it depends on the length so im not sure)
Also, since I have two adjacent tracks, should i use 2 buses for 2 tracks or 4 buses for 2 tracks. Meaning should I use 1 bus wire for 2 tracks or just one.
Hope that made sense...
its a 4x8 layout and how many feet should I get? Also what gauge should I get (i assume it depends on the length so im not sure)
Also, since I have two adjacent tracks, should i use 2 buses for 2 tracks or 4 buses for 2 tracks. Meaning should I use 1 bus wire for 2 tracks or just one.
Hope that made sense...
