Any good pics of your HO or N scale Layouts?

A pair of ACL E8s pulls a string of corrigated streamliners out of Nardin Yard just ahead of an approaching storm on our club layout...
 

Attachments

  • club4.jpg
    club4.jpg
    39.1 KB · Views: 583
aag.sized.jpg



Jon:p :p :p :wave:
 
shaygetz said:
Jon, you have made my boy's day. :thumb: :thumb: Are they all Hornby?

Mostly Hornby with a little Lima (Diesel), Mainline (Henry and a blue diesel whose name escapes me) and Airfix/Dapol (Oliver and Bill & Ben). There's also a lead kit for Toby. Heres some pics of them.

aaz.sized.jpg







abd.sized.jpg


abe.sized.jpg
aab.sized.jpg




Theres Plenty more in My Railimages Album using the link below


Jon:wave: :wave: :wave:
 
Latest Accomplishments as of 12/31/04

Happy New Year All,

I have been busy with wiring turnouts and planning both my downtown area and industry area. I've placed some buildings in both areas and have more to build or buy. Little by litte I am beginning to see where I am eventually headed. :thumb:

I have posted a couple of PIX of those areas.
 

Attachments

  • Downtown Area.jpg
    Downtown Area.jpg
    37.6 KB · Views: 496
  • Industrial Area.jpg
    Industrial Area.jpg
    49.6 KB · Views: 498
Deere Valley & Western Railroad

Happy New Year!

Thought I would share a couple photos of the "Deere Valley & Western" before its demolition and complete rebuild. This is a freelanced layout utilizing John Deere, UP, ATSF & WP equipment. Very busy for a 4x8 but DCC makes it manageable.

The era is summer 1960, so JD 4020's have just hit the dealers. Also, UP still had some functional Big Boys & Challengers, so 4013 and 3985 make appearances along with numerous UP and ATSF F units.

Demolition of the 4x8 will begin in early 2005 and a 5x12 is anticipated.;)
 

Attachments

  • 100_0298a.jpg
    100_0298a.jpg
    63.7 KB · Views: 502
  • 100_0295a.jpg
    100_0295a.jpg
    54 KB · Views: 490
  • 000_0076a.jpg
    000_0076a.jpg
    56.7 KB · Views: 494
Climax #1 heading past the sawmill towards the mine switchback. This picture was taken a year ago with the layout (two sections totaling 2'X8') laying on the ground.
aal.sized.jpg


This is what it expanded to a couple months ago. I've added a scenery divider since this pic.
adb.jpg


The scenery divider is in and most of the trackwork is in as well. Since this picture was taken I built the harbour and a pier to the left. I have pictures but they have to be developed first and scanned
adf.jpg


Another shot
adg.jpg