
Here is another update of the Bay layout. This is an overview with it sitting in front of Templar Street where it will be attached when the micro-challange is done. The line is the main line thru the bay area on the WC & T.
Here the Bay Barge Line tug (not finished) is pushing the Lisa into place
The Bay Side Textile was scratch/bashed out of 3 D P M kits of which I got 3 totaly different structures and bigger, this one, Doc Holidays on the micro-layout and Dugans Cannery in the next picture. They worked great for this area which is build in 4 different levels.
This is the view of the cannery and Anchor Inn, the dark line is where the main line will be, the one lane cobble stone street has since been heavly wheathered,
Another view with some of the water poured, many more coats to go.
More have been done since these pictures, post them a little later.
:blink: Jim
OH, here is one I wanted to show you, I thought it came out pretty neat. I call it Sunrise.