Here's the set-up at the foundry. There are two tracks under the overhead crane. One comes from the switching lead and terminates at the building, the other runs from under the crane into the building. I'm kicking myself for planning it this way, when it would have been so much easier to run one track from the lead directly into the building.
Oh well. Now the guys had to install a winch and motor to haul the cars into and out of the foundry.
A lot of coal gets spilled during transfer, so that's what the wheelbarrow and shovel are for.
Val
Oh well. Now the guys had to install a winch and motor to haul the cars into and out of the foundry.
A lot of coal gets spilled during transfer, so that's what the wheelbarrow and shovel are for.