yeah, i'm prepeared to foul the main. If that happens, main line trains may be required to stop. It can only add fun to Operations, and if it doesnt, well i can always put the train on a Spur, etc.
The Passing siding is designed to serve as both the Passing Siding and Yard Lead too.
I'll have...