So while I've been diligently working away at the small details on my layout, I've been contemplating something drastic. With the addition of a seven foot section in the works, the bench work completed and ready to be installed, I've been getting ideas. The idea would involve a major do over of my layout in certain areas. I would do my best to keep the yard tracks intact at the lower portion of the layout, however, it would involve pretty much changing and redoing a good chunk of the track work at the bottom right corner.
Part of this is to also give the bottom right section a complete makeover. Right now I have a few tracks there for engine servicing. However, the more I look at layouts with dockside tracks the more I fall in love with the idea of having a small lake port with a rail car barge and small tug sitting dock side while a switcher unloads and loads cars. The harbor, the wood dock, barge, I love it.
Another problem is, I do not know what to do with the top left end of the layout. I've got a decent sized chunk of real-estate there, however the little voice at the back of my head is saying less is more and I don't want to get carried away. A part of me is contemplating just stretching out the existing track work to create more distance between the industries and provide more room for non-RR structures and roads for vehicles. I have been thinking about removing the one sided x-over in the area as well and just spacing the turnouts so that it isn't needed.
The old.
The new.
Part of this is to also give the bottom right section a complete makeover. Right now I have a few tracks there for engine servicing. However, the more I look at layouts with dockside tracks the more I fall in love with the idea of having a small lake port with a rail car barge and small tug sitting dock side while a switcher unloads and loads cars. The harbor, the wood dock, barge, I love it.
Another problem is, I do not know what to do with the top left end of the layout. I've got a decent sized chunk of real-estate there, however the little voice at the back of my head is saying less is more and I don't want to get carried away. A part of me is contemplating just stretching out the existing track work to create more distance between the industries and provide more room for non-RR structures and roads for vehicles. I have been thinking about removing the one sided x-over in the area as well and just spacing the turnouts so that it isn't needed.
The old.

The new.
