We've recently had some changes at our house which work out favourably for my layout space! :mrgreen: Previously, we rented our basement out during the week, so I could only use it for MRR on weekends.
Well, we're no longer renting out basement and now have full use of it. I can use the basement bedroom as a temporary train room :mrgreen: -- but it still needs to be available as a spare bedroom.
At any rate, I've had the layout set up now for a week or so and I'm just beginning to see dust accumulating, especially on the trains and rolling stock. Previously, this was not a problem at all since I had to put the railway away after each weekend -- the locos and rolling stock were wrapped in bubble-wrap and put into storage.
Does any one have any suggestions for minimizing the dust problem? It's tedious dusting each loco and piece of stock but that might be the best option!
Thanks,
Rob
Well, we're no longer renting out basement and now have full use of it. I can use the basement bedroom as a temporary train room :mrgreen: -- but it still needs to be available as a spare bedroom.
At any rate, I've had the layout set up now for a week or so and I'm just beginning to see dust accumulating, especially on the trains and rolling stock. Previously, this was not a problem at all since I had to put the railway away after each weekend -- the locos and rolling stock were wrapped in bubble-wrap and put into storage.
Does any one have any suggestions for minimizing the dust problem? It's tedious dusting each loco and piece of stock but that might be the best option!
Thanks,
Rob