So it seems it's been about, well, forever since my last update on the layout hamr
Progress has been slow, but it's moving along. I recently finished up the construction of the helix for the layout. I bought a precut made helix from an ebay seller,
Ashlin Designs, to save me some wood work headaches, except I ended up not paying attention while gluing one of the columns on and it ended up gluing in place on an angle. This ended up throwing some of the levels at a sharp angle ie: ^ between pieces. I should be fix this though.
Otherwise, I've started laying out buildings and planning where roads and buildings are going to go.
I've removed the yard from the lower level and will be adding a "return loop" around the bottom of the room to send train back up the helix (if space allows for the curve, I think it should), and/or create a "roundy-round" lower level.
Work on the refinery continues, and I've ordered the Taco Bell and Dominoes kit from Summit USA, along with the ADM Grain Elevator from Walthers.
My order of track should hopefully arrive in a week or so, containing mostly the bulk of the mainline switches. Once I get these, I'll be able to get a better idea on space needed for mainline trackage for the city and what not.
I'm also still bouncing around names for the subdivision and towns. Georgetown has been scrapped and the layout's current name is the Elmwood Subdivision. I'm sure it'll change a few more times, heh.
Phew...I think that's about it, so here's some pics. Oh yeah, and I installed all the lights for the lower level.
