Questions for someone who knows real trains: When they hook multiple locomotives together to pull a big train, does each locomotive require a separate engineer, or do they connect together to be controlled from the lead loco? Also, secondary locomotives are often facing backwards. Is there a power advantage to pushing rather than pulling?