I have just started a HO railroad. Mianne benchwork 4 x12; NCE DCC and I have started track laying in a Semi Dogbone. Trying to do the Utica, NY yard. Using this as I live 25 miles from there, and this give me CR/CSX; Amtrak; NYS&W and Adirondack Senic and Mohawk, Adirondack & Northern for options.
I have just been driving myself crazy on a track plan (my wife doesn't like to drive). Using the Mianne and what others have done for elevations, wiring, and the 3 million other things that go with model railroading. I am retired and time on my hands. Of couse there is the working with my real estate agent (my wife, again) for space in the basement.
Anyways I hope this is posted where it belongs and not too long. I hope I can follow others on all this stuff before really old age gets me and then alzheimer's sets in and then I may have to start all over!
Thanks
AJ Upstate NY
I have just been driving myself crazy on a track plan (my wife doesn't like to drive). Using the Mianne and what others have done for elevations, wiring, and the 3 million other things that go with model railroading. I am retired and time on my hands. Of couse there is the working with my real estate agent (my wife, again) for space in the basement.
Anyways I hope this is posted where it belongs and not too long. I hope I can follow others on all this stuff before really old age gets me and then alzheimer's sets in and then I may have to start all over!
Thanks
AJ Upstate NY