How often - if ever - do you have more than one train running simultaneously on your layout?
My current layout construction project is designed as a point to point, with an option for continuous running, either single or double-track main line, so the most trains I can run at the same time is two.
My question, however, is do you ever have more than one train running at the same time on the same track?
I'm using DC & power-routing turnouts and have thought about switching to DCC, but I can't justify the cost, since if I run more than one train during a session, I put one on a passing siding, then run the other train by it, etc.
My current layout construction project is designed as a point to point, with an option for continuous running, either single or double-track main line, so the most trains I can run at the same time is two.
My question, however, is do you ever have more than one train running at the same time on the same track?
I'm using DC & power-routing turnouts and have thought about switching to DCC, but I can't justify the cost, since if I run more than one train during a session, I put one on a passing siding, then run the other train by it, etc.