All,
I really need to learn to type, the first post had a period missing in the link. My apologies.
I have just posted a major update to my web site. It is 42 photos of the end of the line town of Deepwater from start to "finish of construction. Below each photo, I have included my strategy and techniques for each of the modules elements. The overall size of this segment of the CVRR is ~30inches deep by 8 feet long. Roads, groundcover, kitbashes and scratch building are all covered. If you have a little time, take a look and I look forward to suggestions and comments that will lead to improvements.
http://home.houston.rr.com/cvrr
Once there click the contents link and its the first item on the contents page.
Jim
I really need to learn to type, the first post had a period missing in the link. My apologies.
I have just posted a major update to my web site. It is 42 photos of the end of the line town of Deepwater from start to "finish of construction. Below each photo, I have included my strategy and techniques for each of the modules elements. The overall size of this segment of the CVRR is ~30inches deep by 8 feet long. Roads, groundcover, kitbashes and scratch building are all covered. If you have a little time, take a look and I look forward to suggestions and comments that will lead to improvements.
http://home.houston.rr.com/cvrr
Once there click the contents link and its the first item on the contents page.
Jim