Hi Guys, I had an extra piece of plywood laying under my bed and I thought hey thats prolly a good size for a nice lil one industry module. Well it was, I ripped the Magic Pan Bakery Complex off my layout and decided to make it a new home :mrgreen:
Now there is a big hole on my layout where the complex was, gee wonder what ill build there next? Hmmm just have to wait and see.
Anyways, here is the progress so far on the module
Magic Pan Yard. The Yard is curently beeing paved at the moment. I had to lay extra stripes of paving tape so the Smooth-It spreader was able to reach accross to touch both sides of paving tape. Still have to finish off the right hand side, includeing adding in another crossing on the far right.
Magic Pan has a Guard Gate. The complex will also have chain-link fence running along the front of the complex.
Magic Pan Warehouse and Truck Docks. There also 2 docks for boxcars on the far right of the building, hence the reason for the track on the far left (currently covered in blue masking tape lol)
The crossings in the Magic Pan Complex.
Magic Pan's Silos, served by 2 tracks, one on either side of the silos complete with Covered Hopper unloading racks (the one closest to you is under the masking tape but you can see the one on the right sticking out of the back of the masking tape).
Magic Pans Office complete with bumping post outside lol
All the roads need to be sanded and then I am going to apply a second light coat of Smooth-It to smoothen them even further. The Crossings also need the flangeways dug out, that will come later with an exacto knife.
More pics to come, stay tuned
Now there is a big hole on my layout where the complex was, gee wonder what ill build there next? Hmmm just have to wait and see.
Anyways, here is the progress so far on the module

Magic Pan Yard. The Yard is curently beeing paved at the moment. I had to lay extra stripes of paving tape so the Smooth-It spreader was able to reach accross to touch both sides of paving tape. Still have to finish off the right hand side, includeing adding in another crossing on the far right.

Magic Pan has a Guard Gate. The complex will also have chain-link fence running along the front of the complex.

Magic Pan Warehouse and Truck Docks. There also 2 docks for boxcars on the far right of the building, hence the reason for the track on the far left (currently covered in blue masking tape lol)

The crossings in the Magic Pan Complex.

Magic Pan's Silos, served by 2 tracks, one on either side of the silos complete with Covered Hopper unloading racks (the one closest to you is under the masking tape but you can see the one on the right sticking out of the back of the masking tape).

Magic Pans Office complete with bumping post outside lol
All the roads need to be sanded and then I am going to apply a second light coat of Smooth-It to smoothen them even further. The Crossings also need the flangeways dug out, that will come later with an exacto knife.