Zealot

I need some assistance. My permanent layout plans are on hold. My wife and I are looking at a move in the near future and I don't want to get too tied up in my permanent layout.
I was wondering if someone could bang out a waterfront switching plan for a 4'x13' space. It is already built.

Givens and Druthers

(Mid Michigan Ry)
Scale: HO
Gauge: (Std

Prototype: (Loosely, C&O, PM)
Era: Late 40's / early 50's
Region: Saginaw Bay, Michigan
Railroad:

Space: 4'x13'
Describe Space e.g. basement. Provide diagram showing Overhead clearances and any obstructions or limitations. It is simply a 4' wide table that spans 13'

Governing Rolling Stock: (Biggest planned) 50'6" gondola

Relative Emphasis: (move the V)

|_____________V_______________________|
Track/Operation .................................................. ..Scenic realism
|_________________________V__________|
Mainline Running .................................................. ........ Switching
Operation Priorities: (rearrange as required)

  1. Local Freight Operations
  2. Engine Terminal Movements
  3. Local Freight Operations
Typical operating Crew: ___1/2___
Eye Level (Owner) __50_In.
________________

DCC with walk around throttle

It needs to provisions for expansion after the move.

Grades: Michigan is fairly flat ground but the waterfront line should be lower than the industrial portion. I will trust the judgement of whomever will take this challenge and run with it as to how to deal with the grades.

Minimum radius 22"
Minimum turnout #4

I would like provisions for a turntable and a 2/3 stall engine house. It does not have to be a roundhouse.
I will be using a mix of motive power between medium and small steam as well as a few diesel switchers.

I greatly appreciate any help.
Matt