Search results

  1. S

    Steep Grade Problem

    Remeasured and more accurately it is a 3.5" rise in 4'. A possible redesign is to run up a grade of 1.75" in 3' ending in a switch and then a straight section of about 2' where one mine would be located. At the switch would be another short section rising about 1.5" in 2' or so to another mine...
  2. S

    Steep Grade Problem

    Great idea Doc. You da man for sure!! I'll give this a try along with lowering the grade and cutting the OSB. This is my first post here and I am very impressed and thankful for the help.
  3. S

    Steep Grade Problem

    Thanks for the replies and the good ideas. The roadbed in this area is 1/2" ODB with 1/2" homosote over the OSB. I'lll give the redesign some serious thought although I've already tried with no luck. Cutting the OSB will definitely help, not enough room for a switchback, but the cable...
  4. S

    Steep Grade Problem

    I have a situation on my new layout where there is a steep grade to a old time mining area. The engines serving the area will be Shays and a Climax. The grade rises about 4 inches in about 3 feet. My problem is with the "hump" at the top and the "dip" at the bottom. How can I make this...