The E-Z track turnouts are okay. But the manually-operated ones are insulfrog, no power in the center, so you have to up the throttle or the train stalls. I do like sidings. My plan is a continuous run main line with a harbour siding, a carriage-storing siding, and spurs that run to the layout...