Search results

  1. K

    A Bad Day at the BNSF Yard in La Crosse

    Look's as if te ground did give in but I wouldn't want to be standing anywhere anywhere within 500 yards just incase one of the truck springs got loose and shot off in any direction. High speed and impact would reconstruct the way you look if you live through it. :/
  2. K

    Operational switching layouts

    Boy did I jump the gun. I was looking at the room and it dawned on me that where I wanted the 11' section to go is where the breaker box is. Oop's. So I'm reducing the 11' to 10' to allow a little room between the wall and the box plus it would make that section to be evenly moduled into two 5'...
  3. K

    Operational switching layouts

    Here is a link to a yard I really like. http://andrews-trains.fotopic.net/p10142324_v10.html Question is can I incorporate this yard into my space while still having a grade running from top to bottom level on the inside nearest to the wall? It say's this file is 33 feet. Could it be scaled down...
  4. K

    Operational switching layouts

    Sorry about that. I should have made it clear. I'm using proto87 products and handlaying it in NMRA standards. All is fine except I have some doubt's about their frog's. I'm not sure if standerad flanges will work or not in proto87 frogs. 90% of what I own have Kato roller bearing rucks which...
  5. K

    Operational switching layouts

    Oh, I forgot to mention I'm modeling current era. I have a 5 set of 48' articulated well car's, 6 set of coal bethgon's, a few 60' flat's. My biggest locomotive's are AC4400's,SD70, 80 & 90 Mac's but I'll probably use SD40-2's and smaller for this layout and just use my larger equipment for...