Here is what I have done in the last couple days, pics are really bad but that is because they came off a camera fone cause I don't have my camera right now, so sorry for the bad pics lol.
We start off looking at the full view
Looking left - Details like trash and junk have not been added to this side of the road yet. So far, I have added the timber retaining wall, some plants hanging down the retaining wall, bushes above the wall, a rock creek bank on both sides to show the path the creek would follow if there was water flowing and the concrete culvert. I havn't decided if I am going to add water yet. The mainlines is were the CNW Dash 9 units are.
Looking Right - This side is complete. I have added a trash can, tin can, 55 gallon oil drum, some 2x4's and some other random wood, a cone, and a few other things that have gotten swept into the creek and have gotten slightly barried in the creek bottom. I also added 2 small pipes coming from the timber retaining walls and into the creek.
Above View showing details
Road Crew on the road that the creek goes under - There is a construction worker in the manhole and another worker kneeling down talking to him. I have layed some shovels and brooms around and a small dirt pile, 2 55 gallon drums, jackhammer, small vibrating compactor, wheelbarrel, and some cones to the scene.
Now to finish the right side of the creek.
Sorry guys for the bad pics
ops: :cry: Hope you can see them enough to enjoy them :thumb: sign1
More to come next week