Update on the layout

Ray Marinaccio

Active Member
Aug 4, 2003
1,940
0
36
66
Dewey Az.
Visit site
I have been working on a mine scene on top pf the mountain.
It will not only provide an industry in the area but also a view block to hide the return loop when viewed at track level.
The mine building is being built from an incomplete AHM coal tower and some left over corrugated tin parts from a Suydam kit.
 

Attachments

  • Sep12^01.JPG
    Sep12^01.JPG
    40.2 KB · Views: 39

Ray Marinaccio

Active Member
Aug 4, 2003
1,940
0
36
66
Dewey Az.
Visit site
I built a guide attachment for the milling machine to feed some N scale rail through and mill it down to .045" high.
Brass ties were soldered at the ends and wood ties were glued in to make the 18" gauge track. The track inside the building was glued directly to the floor.
A turntable was made from a brass washer and short pieces of rail.
 

Attachments

  • Sep23^04.JPG
    Sep23^04.JPG
    67.1 KB · Views: 42