Starting my NTrak modules

Bill Pontin

Member
You can see that seven tracks will cross a planned river, lots of different types of bridges needed. The two front (Red/Yellow) Ntrak lines will cross with a double track structure of some sort. Most of the others will be typical logging style, throw down some heavy logs lay some track and get from point A to point B
 

NYNH&H

Member
Nice looking! What is the wiring and control for this setup? How many other modules have the Green Line?
 
Top