ok, tonight im going to build a layout.

Discussion in 'G / O / S Scale Model Trains' started by ozzy, Jan 20, 2008.

  1. ozzy

    ozzy Active Member

    Joined:
    Jun 25, 2006
    Messages:
    1,115
    Likes Received:
    0
    ok, i been running trains!!!!!!


    its completely different then the plan i started with. and its just track on the wood bench work, went with one line, but it has more then one route to take and has inclines. i have some tweaking to do,,, before im 100% happy with it, but i need some more track pieces . i will take it up in a few weeks when i buy some grass mats. and i will then put foam under the track. and i would like to get a couple bridges.

    my main goal was to have running trains before friday, as i will have surgery then and i wanted to be able to run trains while im home 3 or 4 weeks healing.
  2. steamhead

    steamhead Active Member

    Joined:
    Apr 17, 2005
    Messages:
    2,530
    Likes Received:
    0
    Ozzy...This is for sure some adventure..!!! And all the trials and tribulations others have gone through sure did get some chuckles....Hope everything works out OK with you and the CO....And hope your surgery goes OK..!! Keep us posted.
  3. Renovo PPR

    Renovo PPR Just a Farmer

    Joined:
    Dec 23, 2006
    Messages:
    1,043
    Likes Received:
    0
    Hey best wishes on the surgery.
  4. ozzy

    ozzy Active Member

    Joined:
    Jun 25, 2006
    Messages:
    1,115
    Likes Received:
    0
    oh ya, all the bench work was made out of scrap lumber, or leftover lumber from other home projects, only thing i had bought for it was screws.
  5. ozzy

    ozzy Active Member

    Joined:
    Jun 25, 2006
    Messages:
    1,115
    Likes Received:
    0
    well my 1:48 Lionel husky stack car will not fit under my lionel elevated trusses , they are 5 1/2" tall,,,, if i just had a 1/4 inch more...lol
  6. Brutus

    Brutus Member

    Joined:
    Nov 9, 2007
    Messages:
    697
    Likes Received:
    0
    Ozzy, sounds like you got a lot done dude. Can you make some little wood feet or spacers for under your trusses - that's what I did one time, just fyi.

    Good luck on your surgery Friday and keep us posted, okay?
  7. Geno

    Geno Member

    Joined:
    Jan 4, 2006
    Messages:
    306
    Likes Received:
    0
    Ozzy,
    I use scrap pieces of 1/4", 3/8" and 1/2" MDF, srounged up for free from a cabinet shop- rip these on a table saw and you're good to go on shims.

    The Lionel Husky stacks are tall boys. Try running them through Lionel's Extension bridge (6-12772) on Fastrack- no joy there. I barely got the Husky Stack to fit with 027 tubular track- had to take the center reinforcing ribs out of the top of the bridge.

    Geno
  8. rtraincollector

    rtraincollector Member

    Joined:
    Nov 17, 2007
    Messages:
    190
    Likes Received:
    0
    I haven't been to his house yet but there is a gentleman that I have bought trains from a few times in york hes a proffesor at one of the collages up there any way he has 15 operating train layouts occupying about 2500 SQ Feet of his house. Next time up think I'll go and get some pics for you all.
  9. ozzy

    ozzy Active Member

    Joined:
    Jun 25, 2006
    Messages:
    1,115
    Likes Received:
    0
    think i can get away with another extension tonight?......lmao
  10. scubadude

    scubadude Member

    Joined:
    Sep 5, 2006
    Messages:
    326
    Likes Received:
    0
    Doo-it, Doo-it, Doo-it ! :twisted:
  11. gkcooper365

    gkcooper365 New Member Old S Scale

    Joined:
    Oct 27, 2007
    Messages:
    22
    Likes Received:
    0
    Thanks for sharing

    Ozzy,
    I really enjoyed your story, and the great progress you have made. The boss helps me buy stuff for my layout, and is getting ready to paint some people for me. I am going to start a thread and share a little on my layout. Thanks for the push to get me contributing on this forum.
    George
  12. Geno

    Geno Member

    Joined:
    Jan 4, 2006
    Messages:
    306
    Likes Received:
    0
    Ozzy,
    How's your progress coming along? Have you made peace with your wife yet?

    Geno
  13. ozzy

    ozzy Active Member

    Joined:
    Jun 25, 2006
    Messages:
    1,115
    Likes Received:
    0
    peace?... yep,,, i can leave it up the way it is for now while im home recouping from surgery. then we will go into negotiation's on how i can add on.
  14. scubadude

    scubadude Member

    Joined:
    Sep 5, 2006
    Messages:
    326
    Likes Received:
    0
    Hey Ozzy, glad you are home and hope your recovery goes well...now on to business.....I say you negotiate NOW, while Momma may have a little post-surgery sympathy! :twisted:
  15. ozzy

    ozzy Active Member

    Joined:
    Jun 25, 2006
    Messages:
    1,115
    Likes Received:
    0
    here are some pics.

    Attached Files:

  16. ozzy

    ozzy Active Member

    Joined:
    Jun 25, 2006
    Messages:
    1,115
    Likes Received:
    0
    more

    Attached Files:

  17. ozzy

    ozzy Active Member

    Joined:
    Jun 25, 2006
    Messages:
    1,115
    Likes Received:
    0
    even more

    Attached Files:

  18. ozzy

    ozzy Active Member

    Joined:
    Jun 25, 2006
    Messages:
    1,115
    Likes Received:
    0
    the last of them.

    Attached Files:

  19. kfh227

    kfh227 Member

    Joined:
    Jan 12, 2008
    Messages:
    49
    Likes Received:
    0
    Ozzy,

    Awesome pictures. That setup is looking good. Whenever I see layouts like that in O gauge I rethink my idea of the around the room setup.
  20. ozzy

    ozzy Active Member

    Joined:
    Jun 25, 2006
    Messages:
    1,115
    Likes Received:
    0
    this layout has a loop, and then if i want it to it can be a loop to loop with both loops at the same end of the layout, one upper and one lower.

    the upper loop is a mix of 036 and 048 curves .

    i have plans to make changes to it already,,,,, when i get some more switches and other track pieces.

    right now i can run 2 different routes, but only one train at a time, i want to change it just a little bit to run 2 trains at a time and have a siding or two.. the 2 sidings i started out with are now the up and down grades of the upper loop.