New Layout

Discussion in 'G / O / S Scale Model Trains' started by Alan d Lambert, Jun 28, 2007.

  1. Alan d Lambert

    Alan d Lambert Member

    Joined:
    Dec 25, 2006
    Messages:
    48
    Likes Received:
    0
    Well, I got 2 new switches from S-Helper and can expand from 1 to 2 main lines and branch lines. I will still use my old Flyer track and switches, 5x9 just got bigger, as I can expand out for bigger spaces at public shows and Malls that will let me. We have shows that have limited space for layouts in the Fort Worth, Texas area. The Malls should be different because nobody has done it before as a promotion