N Gauger 2005 Challange

Discussion in 'Scratchin' & Bashin'' started by N Gauger, Oct 20, 2005.

Thread Status:
Not open for further replies.
  1. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Someone hold my wallet :) I'm going to the LHS tomorrow to buy my Tower Kit :) :
  2. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    I cleaned up the thread a bit (Sorry Ed)

    Step 1:

    The workbench

    Attached Files:

  3. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Step 2:

    get all the parts out :D :D :D

    Attached Files:

  4. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Step 3:

    Get rid of the directions & Separate all parts into a pile :) This is a scratchbuild!!!!

    Attached Files:

  5. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Step 4:

    Start cutting parts to make "Things you need" and start gluing them together :D :D

    I'm using parts from the roof "collar" as supports for the walls, of the second floor.

    Attached Files:

  6. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    If you look at everything in the pics....you'll figure out what it will be :) :)

    If you still don't have it by tomorrow, When I put the "walls " together - you'll see what it will be & I'll also reveal the entire scope of the errr project :) :) :)
  7. ausien

    ausien Active Member

    Joined:
    Sep 14, 2004
    Messages:
    1,051
    Likes Received:
    0
    Mikey, did you only, buy, what you went to the lhs to buy?? did ya?
  8. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Yup - The Model & the Glue & a Garden Railway - Exactly what I set out for :)
  9. eightyeightfan1

    eightyeightfan1 Now I'm AMP'd

    Joined:
    Jun 18, 2002
    Messages:
    2,837
    Likes Received:
    0
    Looks like the thread wasn't the only thing you cleaned up......
    You're among friends Mikey ;) ....You can tell the truth. ;) .Thats not all you came home with...isn't it? :D :D
    Looks like you got a good start.
  10. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    No guesses eh??? :( :(

    Here we go :)

    Remember the Outhouse????

    Attached Files:

  11. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    I decided that I would take the signal tower and compliment the "wreck train" with a MOW car or 2 - The Signal and MOW repair train. Scratchbuilt with the O gauge Signal Tower :)

    Step 5:

    The building itself.... You have to put the windows in and the doors, then glue everything in. and glue the walls together.

    At the bottom you can see the yellow (Second floor) is now a workroom, which has a bench (taken from a G gauge model somewhere). The brown sections at the bottom of the walls, are pieces of the roof capping from teh signal tower.

    The red car (top) will be the storage room.

    Attached Files:

  12. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    I used the second floor - the actual floor, to block out some of the windows.

    Attached Files:

  13. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Step 6 Roofs

    I could not use the "real roof" that came with the kit, so I improvised, I thought a metal roof would be neat - and I made a wooden one too :)

    I included a few extra pics showing that I used tongue depressors put a few pieces of anti-skid tape to the top for a rough finish and then after it dried, I painted it with "Wroght Iron Green" paint :)

    I used pieces of aluminum for the other roof, cutting them to size with the hacksaw and then a bench grinder to round the corner. Double sided tape sticks them to the top of the walls.

    Attached Files:

  14. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Step 7

    The rules say:

    You must base your kitbash on the ATLAS tower........ You DO NOT have to use it for a tower,but you must use most of if not all of the kit in your bash.

    So, Now the difficult part, where to use those left over parts.... Well, a warehouse that moves will have to have some kind of "rack" to store stuff.... Those atairs make a great floor rack. I cut the stairway down, lined them up and..........

    The first shows the racks... and since this is a signal repair car - the signal "parts" are in the second pic.

    Attached Files:

  15. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Also in that second pic is the signal tower switch handles, some extra chain, a brake cylinder (on wall) and a couple tools too :)
  16. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Some more extra stuff, We need a ladder to climb signals to repair them, some barrels ans a shed come with the model, I stuck them outside. :) There were a bunch of G tools I had, so I included them too.

    Attached Files:

  17. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Oh, we also could use some replacement signal faces :) No - I didn't buy any just to break them, I printed pics of them & stuck them (hung them) on the walls, (used to be part of that floor) :) There is also more tools & a semaphore arm there on the bench. ALso to the left of the bench there are more "signal tower" brackets.

    Attached Files:

  18. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Well, that;s it so far, I still have a bit to go.... but here's what it'll look like from outside, with the Outhouse at the point. :D :D

    Attached Files:

  19. 60103

    60103 Pooh Bah

    Joined:
    Mar 25, 2002
    Messages:
    5,135
    Likes Received:
    0
    Mikey:
    I suggest you enter that one in the "Thumbs" category at the NMRA convention next year.
  20. N Gauger

    N Gauger 1:20.3 Train Addict

    Joined:
    Dec 20, 2000
    Messages:
    7,260
    Likes Received:
    0
    Thanks :) :) i'm not a member of NMRA :( But that's a great compliment :D :D
Thread Status:
Not open for further replies.