    Swingarm and gantry #4 installed

    Last night I was able to build and install swing arm #4,

    [​IMG]

    Tonight I drew out the corresponding gantry...this one is a twisting and turning mess but turned out ok.

    [​IMG]


    It's all installed (before the bracing was installed) now time to move onto #5!

    [​IMG]
  2. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    Thanks!

    Thanks to everyone for the kind remarks!

    Wayne, yup everything has been printed out on regular 8 1/2 x 11 card stock. I am careful to make sure I organize the joints so they fall on an area that will be hidden or part of "the image" has a line which will conceal it somewhat. My joints are all butt joints (no overlapping), again to minimize their visibility. On long pieces like the main vertical girders, swingarm support girder, and receiver girder, I just tried my best to make a nice clean, tight joint. Some are noticeable but after all the piping and extras get installed there will be too much to look at to even see the joints.....I hope. :mrgreen:

    Regards,
    George
  3. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    Up to Swing Arm #6

    Hey Guys,

    Swing arms #5 and #6 are installed (details still need to be attached) as well as Gantry #5. Gantry #6 is exactly the same so it should go in quickly.

    I replaced all the gantry support brackets with more scale looking "L" shaped ones. Swing arm receivers and shock absorbers have also been installed. I'll post photos of all this stuff tomorrow.

    [​IMG]

    -G
  4. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    LUT Small Details

    Here are a few photos of the smaller details I've added. They include the Gantry support brackets (piping will run through these) and Swing Arm shock absorbers.

    [​IMG]

    [​IMG]
  5. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    End of swingarm installation

    Hey Guy's,

    Sorry for the lack of updates. I've been busy the last few days. All Swing arms are installed as well as one of the power carrier array's (PCA's). I hope to have the remaining gantries (3) installed today. They are not too complex so it should be a smooth install.

    This is the current status.

    [​IMG]

    -G
  6. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    Swing Arm #9 Details

    Hey Guys,

    Swing arm #9 has turned into a bit of an engineering challenge. To give you a bit of background on this. When swing arm #9 retracted, it moved over the gantry, so the gantry was designed to collapse flat enabling the swing arm to fully retract. Here's a WIP photo of the what I have partially came up with.



    [​IMG]
  7. BARX2

    BARX2 Member

    Joined:
    Nov 29, 2006
    Messages:
    575
    Likes Received:
    0
    Amazingly lifelike! Fantastic work. :thumb:
  8. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    More small details

    Hey Guys,

    Photo update time! Here's a photo of Gantry #9 Side 3 showing the EES support bracket and platform area. The upper left of the photo shows part of the scratch built swing arm #9 support structure.

    [​IMG]

    Top view of the same area. Two more pieces of railing still need to be fitted and attached.

    [​IMG]

    Here a cool little known detail I added, at the time it was seen only by a select few...sorry it's hard to read in the photo.

    [​IMG]
  9. NYC Irish

    NYC Irish Member

    Joined:
    Apr 27, 2004
    Messages:
    605
    Likes Received:
    0
    Amazing well done

    Ehhh...by the way What does it say on the sign?

    Im hoping something like "You must be this high to enjoy the ride"?

    Great work

    John John
  10. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    :mrgreen:

    Actually it reads "Max persons cap, service arm 10 extension platform 2
  11. mj7601

    mj7601 New Member

    Joined:
    Aug 7, 2007
    Messages:
    3
    Likes Received:
    0
    Lut

    Wow that tower is awesome, can't wait to see it finished, by the way I sent you a pm, thx Mike
  12. mj7601

    mj7601 New Member

    Joined:
    Aug 7, 2007
    Messages:
    3
    Likes Received:
    0
    Hey Charles please do keep putting up pics as you finish this thx Mike
  13. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    A Few updates

    I've only had time to add a few things to the LUT since my last update. The camera platforms have been installed (no camera or lights yet) and I added a few details to the elevator shaft at each levels door location. I printed out the Emergency Egress Map which was installed at the elevator doors plus I added a graphic to simulate the elevator buttons....I think I've lost my mind.

    My research continues on the correct routing of all the piping. :cry:

    [​IMG]

    [​IMG]
  14. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    MLP Update

    Hey guys,

    I've rebuilt the MLP and added ribbing and folded out an "edge" at the bottom, I didn't like the way it was just flat all the way down to the bottom. I also edited out all the pipe images from the sides and started applying "real" pipe.

    I test fitted one of the legs (from Greelts MLP). Although it was enlarged, I thought it was too small (photo 1) so a larger version was made (Photo 2). One more correction still needs to be made to the railings.

    I had to fabricate an offset (photo 3) because the main leg support tube was installed on the inside corner of the MLP, while the legs actually connect at the corner further out. A layer of fiberglass will be applied to the offset to add necessary strength. Eventually the legs will be mounted to a painted piece of wood to simulate part of PAD 39. The legs will be removable in case it is to be displayed with a Crawler.


    Regards,
    George

    Attached Files:

  15. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    MLP Update

    Hey guys,

    Corrections have been made to the MLP legs. Larger diameter, correct size service platform and correct spacing for the railings. All have now been installed.

    [​IMG]



    Here's the latest WIP shot of the LUT installed on the MLP in the Florida sun. :)

    [​IMG]


    [​IMG]


    I'm now going to begin work on the Power Carrier Array and Propellant Piping......updates to follow.

    Regards,
    George

    Attached Files:

  16. Amazyah

    Amazyah Senior Member

    Joined:
    Mar 1, 2006
    Messages:
    2,544
    Likes Received:
    0
    Wow!
    I think I am going to have to get a copy of this model for myself!
    Your workmanship is superb and the model looks excellent!
    Very inspirational! [​IMG]
    Kudos!

    Russeell
  17. sergiotang95

    sergiotang95 Member

    Joined:
    May 12, 2007
    Messages:
    46
    Likes Received:
    0
    Very very good! I might try one out too.
  18. londonbluemisty

    londonbluemisty Wayne P

    Joined:
    Mar 31, 2007
    Messages:
    218
    Likes Received:
    0
    :thumb:Once again George,
    FANTASTIC!!!!!
    What is to become of the old M.L.P??
    Surely you are not going to throw it away??
    You will have to keep it for a future project!!
    Maybe a display of a Saturn 1B c/w Milkstool???.....
    Regards,
    Wayne

    Attached Files:

  19. Nando

    Nando Designer Extraordinaire

    Joined:
    Oct 5, 2006
    Messages:
    326
    Likes Received:
    165

    I'm ashemad but I have not been able to resist: I bought my copy and now i'm waiting for it :cry: : when will i can build it ?!?! aaahhhggggghhhhh wall1

    WONDERFUL
  20. George B

    George B Senior Member

    Joined:
    May 29, 2007
    Messages:
    260
    Likes Received:
    0
    Not to worry, the seller is an honest and reputable person so I'm sure he has sent it out.

    Regards,
    George