Gauge Layout Party No 5

N Gauger

1:20.3 Train Addict
Dec 20, 2000
6,732
0
36
South Eastern, PA
mywebpages.comcast.net
It will be from January 15th to February 27th :) 6 weeks :)

Start deciding on what you want to work on. :)

Gauge layout Party #4

The Rules:

~~~ Anything Model related is ok...

~~~ Pics are always a good thing (Eye Candy isn't fattening)

~~~ You have to have some idea on what you can do in 1 month or 6 weeks It feels good to actually accomplish something like this!

~~~ H A V E :) F U N!!! -- If you ain't enjoying it....You ain't doing it right!!!!!!!!!!

----------------------------------------------------------
"Guest List"

Seanm - an N scale Helix
 

grumbeast

Member
Jan 13, 2003
455
0
16
55
Dartmouth, N.S. Canada
www.accesswave.ca
I'm going to commit to finishing the buildings and mountain at Colinport.
I have some pics of where things are now that I'll try and post this evening. Basically there's a big white mountain and some partially assembled Mill buildings sitting up on blocks.

Graham
 

COCentralRR

New Member
Dec 31, 2004
6
0
1
59
Longmont, CO
I'll throw my hat into the ring...

I will be building a control panel for my my layout. It will have indicator lights on a track diagram, along with connectors for signal lights on the layout, to be added later, as my budget allows. I finalized the design this weekend, and set up a test circuit to figure out if my design really works (It does, yay!!!). I also need to finish ballasting my track as well, and remote wire 12 turnouts. There's lots more to be done, but I'll start with this for now...
 

trains1972

Member
Sep 1, 2004
143
0
16
51
philadelphia, pa
pg.photos.yahoo.com
here are pictures of my layout that I am going to be putting trees and bushes on. There are some areas that the ground cover still has to be done before the trees can be put on.
im0032345cb.jpg

im0032358yz.jpg

im0032361zy.jpg

im0032370pl.jpg

im0032380qe.jpg
 

Freelancer

Member
Oct 24, 2002
309
0
16
Utah
www.yardlimit.com
Can't pass up a party! I have had a large list for each party and never even completed half of the stuff I wanted to, so this time I will keep it short.

Work on my modules.
And build some buildings

Here's The First Draft of The List!!! Freelancer -- Wiring Lights, Decoders and layout construction (planning for party # 5 Already)
N Gauger so much for "planning ahead," here is party #5 and I am not even close to working on my benchwork. :D

Freelancer
 

Ray Marinaccio

Active Member
Aug 4, 2003
1,940
0
36
66
Dewey Az.
Visit site
I am going to try to finish some of the locomotive projects on the back burner.
Mainly the 2 MDC 0-6-0Ts, a pair of Athearn GP7s and a pair of Athearn GP35s I've been putting off.
I may also work on the locomotive service facility on the HO layout.
 

TomPM

Another Fried Egg Fan
Oct 15, 2002
3,335
0
36
61
Drexel Hill, PA
www.trainweb.org
Well I guess I have to throw my hat in the ring now.

Originally I was hoping to do bench work but for the umpteenth time the acquisition of lumber has been pushed off, hopefully this time only for a month. A month, however, won’t fit into the party time frame. Time to go to back up plan.

For Party No. 5 I will be returning to the subject of Party No. 2: the Passenger Station Diorama. (At least I think it was Party No. 2). What I would like to accomplish is:
Recolor the rock abutment and creek walls.
Finish the foliage.
Add some more details to and around the station structure.
 

grumbeast

Member
Jan 13, 2003
455
0
16
55
Dartmouth, N.S. Canada
www.accesswave.ca
Some pics of the area umder development

Here are some pics of the mill area and the mountain (N Scale)

Any suggestions for the space are particularly welcome!

Graham
 

Attachments

  • 0.jpg
    0.jpg
    42.6 KB · Views: 122
  • 2.jpg
    2.jpg
    30.8 KB · Views: 113
  • 3.jpg
    3.jpg
    33.5 KB · Views: 123
  • 4.jpg
    4.jpg
    36.1 KB · Views: 112
  • 5.jpg
    5.jpg
    31.5 KB · Views: 120

emt49

Member
Jan 5, 2005
117
0
16
45
binghamton
here is what i got planned

1 finish cleaning out the old layout

2 start bulding the new layout 4 tables 8 foot long by 3 foot wide

4 lay track and wire switches


will i get it done depends on cash flow :)