Comments requested

Discussion in 'Track Planning' started by babydot94513, Mar 4, 2003.

  1. babydot94513

    babydot94513 Member in training

    Joined:
    Sep 2, 2002
    Messages:
    353
    Likes Received:
    0
    Here is my latest creation in the home layout. The attached is only a portion - the operational part, of the entire layout. The local yard is a totally separate module and not really a concern.

    This industrial layout will be built in modular format ie: 48x96 (2) for an over-all industrial switching layout of 4ft by 16ft.

    I have accounted for the fact that I (like most) cannot reach across 4 ft, so the maximum reach that I have to deal with is 36 inches. The rest will be fill-in effects and a backdrop to add realism to the entire over-all layout.

    On paper, the buildings and where I have selected the various loading/unloading ramps and roadways for vehicular traffic works out.

    Looking for any comments on what I may have missed.
  2. Gary Pfeil

    Gary Pfeil Active Member

    Joined:
    May 8, 2001
    Messages:
    2,593
    Likes Received:
    0
    Hey Jeff, You forgot the attachment! I thought only I did that.