And awayyyyyyyy we go!

Discussion in 'HO Scale Model Trains' started by Mrs.Mac, Nov 13, 2003.

  1. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    It begins.




    The new HO layout.
    Here is the corner of the living room (yes, it's in our living room) before the improvement. The plywood and table against the wall are leftovers from my old layout.

    Attached Files:

  2. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    Step one.....

    Attach 2x4s 12' long to the 3/4" plywood. No sagging or warping allowed here.

    Attached Files:

  3. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    The cross bracing to make sure everything stays true.

    Attached Files:

  4. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    The legs attached

    Attached Files:

  5. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    And the cross bracing

    Attached Files:

  6. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    And it's upright. WOW is it heavy!!! Thanks goodness the rest is lightweight foam. Or else it may never get back into the corner.

    Attached Files:

  7. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    Waiting for the Liquid Nails to dry.

    Attached Files:

  8. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    The very rough beginnings of the lake.

    Attached Files:

  9. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    Here is the overall layout plan.

    The outer greenish loop is the lower loop. The blue is the main loop which is 5 1/2" above the lower. The red is the trolly level which is 3 3/4" above the main loops.

    Attached Files:

  10. pomperaugrr

    pomperaugrr Member

    Joined:
    May 21, 2003
    Messages:
    125
    Likes Received:
    0
    Mrs. Mac:
    That is outstanding work. I love the design of your benchwork! It looks like you'll have some nice storage space under the layout too! I notice that you seem to have "Mr. Mac" stored under there in the 6th photo. ;) Will you have sufficient access to the back of the layout? I would be sure to leave at least some space between the wall and the rear portion of the layout for track cleaning and re-railing equipment.

    You are off to a great start! Keep us posted as to your progress. We never get tired of progress photos.

    Eric
  11. Ralph

    Ralph Remember...it's for fun!

    Joined:
    Jun 18, 2002
    Messages:
    5,347
    Likes Received:
    0
    Hi there!
    That is some sturdy and well built benchwork! Nice carpentry! You're going to make the layout a piece of your livingroom? Cool! I take it from your track plan that you most enjoy long continous runs, two train operation and probably have a large collection of locomotives (?). Looking forward to updates!
    Ralph
  12. shaygetz

    shaygetz Active Member

    Joined:
    May 2, 2003
    Messages:
    3,877
    Likes Received:
    0
    Nice benchwork, you could have a brawl on one end and not even derail a car on the other:D Great work.
  13. Matthyro

    Matthyro Will always be re-membered

    Joined:
    Dec 28, 2000
    Messages:
    4,767
    Likes Received:
    0
    A good and sturdy structure that should give you years of railroading fun.
  14. Arlaghan

    Arlaghan Member

    Joined:
    Sep 9, 2003
    Messages:
    668
    Likes Received:
    0
    Wow!

    Looks real strong! I made benchwork similar to that in my garage... you could literally body tackle it and it won't budge. Great for avoiding derailments from the casual passer-by. :D
  15. Tyson Rayles

    Tyson Rayles Active Member

    Joined:
    Sep 26, 2001
    Messages:
    4,501
    Likes Received:
    0
    You heavily insured Mr. Mac and your hoping building and moving the benchwork will do him in?????????????? :D
  16. shamus

    shamus Registered Member

    Joined:
    Dec 17, 2000
    Messages:
    3,688
    Likes Received:
    0
    Hi Mrs Mac, and welcome to the gauge, guess I missed this one.
    Great start on the new layout, the baseboards look very good indeed. Hope to see more photos as you progress.
    Shamus
    [​IMG]
  17. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    Well, I managed to get a ton accomplished over the long weekend.

    I got the lower loop of track laid, and about 1/2 of the upper loops. I have to visit my LHS for some more track and stuff before I can finish. All that time waiting for the liquid nails to dry gave me alot of time to start painting the lake and the river/waterfall areas.

    I took pictures throughout the process and will be posting them soon.

    Here's to an operational and partically sceniced layout by Christmas when family visits.

    Cheers!!:D
  18. MasonJar

    MasonJar It's not rocket surgery

    Joined:
    Oct 31, 2002
    Messages:
    5,724
    Likes Received:
    0
    Holy moly!

    Any chance of help..? I have been at this for a while now (it's kind of embarrassing how long) and I haven't permanently attached anything to anything else!

    Good work!!

    Andrew
  19. Lighthorseman

    Lighthorseman Active Member

    Joined:
    Jul 24, 2002
    Messages:
    1,387
    Likes Received:
    0
    Can't Wait!

    Hopping from one foot to the other to see your progress! :)
  20. Mrs.Mac

    Mrs.Mac Member

    Joined:
    Nov 6, 2003
    Messages:
    44
    Likes Received:
    0
    Progress has come along way. Only that progress on the layout has stalled the process of getting the pics from the camera to the computer to here. But they do exist.

    Let's see. Since my last post, I'm completed laying the main line and trolly levels. Yeah!!! I'm working on the wiring and control panel now. The layout is functional with the exception on the 2 reversing loops. Can't power those until my control panel is done.

    I built a Faller 2-track bridge for over the waterfall area so I won't lose any locos into the river.

    I hooked up my new Digitrax system last night and ran my BLI GG1 around the track a few times. I love it!!! The joys of getting all those sounds are all worth the expense. My stable may become mostly BLI one day.

    Anyway, I have the mountain partially constructed and glued down. Need to finish painting the interior walls before putting the ceiling layer on and enclosing it (with the exception of several access panels).

    The Christmas tree layout is painted and awaiting track and a tree as well.


    pomperaugrr, The layout will be about a hand width or so from the wall to allow access for derailments and cleaning.


    I'll hopefully get to work on the Christmas tree layout tonight and get that done, so I can concentrate on the main layout. Although I'm supposed to be going to the grocery store, but alas I'm stuck at work because Mr. Mac is still at work and we carpooled today.

    See you all tomorrow.
    :D :D :D