HobbiesHobby ForumWikiHobby Blogs
Zealot Hobby Forum

Go Back   Zealot Hobby Forum > Trains & Railroads > Gallery & Designs > Track Planning

Reply
 
Thread Tools Display Modes
Old 06-16-2006, 04:26 AM   #1
Haggis
Inactive Member
 
Join Date: May 2006
Posts: 20
Downloads: 0
Uploads: 0
Default Track Plan

Anyone tell me how i can post a Track plan to get some thoughts and comments on it??

Regards

Alan Aitken
Haggis is offline   Reply With Quote

Advertisement [Remove Advertisement]

Old 06-16-2006, 05:15 AM   #2
cidchase
Senior Member
 
cidchase's Avatar
 
Join Date: May 2002
Location: somewhere between Clarksville and Zhanjiang
Posts: 1,671
Downloads: 1
Uploads: 0
Default

__________________
The Home of the Brave, and the Land of the Free Electron!
Cid
cidchase is offline   Reply With Quote

Old 06-16-2006, 05:18 AM   #3
Haggis
Inactive Member
 
Join Date: May 2006
Posts: 20
Downloads: 0
Uploads: 0
Default

Hello

i hope this link works, please comment on the layout attached


http://www.the-gauge.com/gallery/showimage.php?i=1438&c=3

Rail Road Info

Name:- Wolf Creek Railroad

Scale:- On30 1:48

Theme:- Logging, Early 1900’s

Loosely Based on the Little River Lumber Company, in the Smokie Mountains, Tennessee, USA.

Any Comments would be great

Cheers

Al
Haggis is offline   Reply With Quote

Old 06-16-2006, 06:11 AM   #4
cnw1961
Senior Member
 
cnw1961's Avatar
 
Join Date: Jan 2006
Location: Germany
Posts: 942
Downloads: 0
Uploads: 0
Default

Hello Alan, if I read your plan properly, I see, that you only have a clearance of 20 cm between your levels. And you even have to subtract some space for benchwork (or a piece of plywood), roadbed etc. from those 20 cm. How about lightiing for your 2 lower levels? I think you will end up with only 10 or 15 cm left between your levels, hardly enough to build any scenery.
__________________
Kurt
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
cnw1961 is offline   Reply With Quote

Old 06-16-2006, 06:25 AM   #5
Haggis
Inactive Member
 
Join Date: May 2006
Posts: 20
Downloads: 0
Uploads: 0
Default

Cheers for the reply.

The Staging level will be below the main boards and have no scenery.

The other two levels are on the same level just higher, so it is not the different levels.

the mid level track will be on the lower levels on the lagoon hillside and the higher level will be futher up the slope, so the scenery will be one.

Its as if the middle of the room will be a lagoon or bay, and the benchwork will be the hills around!!!

I hope this makes sence???

Cheers
Haggis is offline   Reply With Quote

Old 06-16-2006, 07:38 AM   #6
pgandw
Senior Member
 
Join Date: Jul 2005
Posts: 1,133
Downloads: 0
Uploads: 0
Default

I guess I'm trying to understand the operational flow. From what I see, you have the sawmill at the summit, with a dock and trestle bridge much lower down. Staging is below that. But there is no logging or log loading area. Seems to me that ideally you would want a loads in/empties out arrangement at the sawmill, and an empties in/loads out arrangement at the log loading area.

Don't know a lot about Eastern logging. But Western logging tried to put saw mills beside some kind of water storage for the logs where available. Typically, the best harvestable stands of trees were upslope. So logs would be loaded up in the mountains, transported downhill to the saw mill, and then further transported to some kind of interchange with another railroad, or to a marine terminal on a large lake or ocean port.

I would draw your 2nd and 3rd levels to scale, super-imposed on each other so things like clearances and grades can be checked. Also, with a non-scale drawing curves and turnouts don't take up as much room as in real life, and it's impossible to know whether passing sidings are long enough for your proposed train length.

yours in scale logging
__________________
Fred Wright
Jack of All Trades for the
Picture Gorge & Western Railway - none more picturesque
Port Orford & Elk River Railway & Navigation Co - home of the tall cedars

...in foggy coastal Oregon where it's always 1900...
pgandw is offline   Reply With Quote

Old 06-16-2006, 12:40 PM   #7
Russ Bellinis
Senior Member
 
Join Date: Feb 2003
Location: Lakewood, Ca.
Posts: 4,755
Downloads: 0
Uploads: 0
Default

Your lower staging level has me a bit perplexed. It appears to be drawn as a mainline with multiple short passing sidings. I have a few questions. 1. Does a logging railroad even need staging? Staging is usually used to simulate locations beyond the layout. Unless you have a class 1 railroad interfacing with the logging railroad to pick up lumber with a train passing through from off the layout, and then to deliver the lumber off the layout, I'm not sure it is needed. 2. If you are going to use the staging for a class 1 railroad to have trains to pick up the lumber from the saw mill, how much traffic will there be. I think that typically the sawmills were more likely to be located on a branch line of a railroad than a mainline. 3. Why have such short sidings in an unsceniced staging yard. It doesn't look like any of those sidings in the staging yard will hold an entire train. Finally, I have to agree with Fred, I think you have the elements that belong on the upper level on the lower and the lower level on the upper.
Russ Bellinis is offline   Reply With Quote

Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
SP in Texas track plan and operating plan, what do you think? hubba90bubba Track Planning 5 06-01-2007 12:40 PM
New track plan Nomad Track Planning 42 03-26-2007 11:00 AM
Track plan help Joepomp Track Planning 8 09-17-2005 04:47 AM
Asking for a track plan (and something else) CharlesH. HO Scale Model Trains 9 08-09-2004 11:57 PM
Track Plan ponuscasa Track Planning 1 11-11-2002 11:06 PM



All times are GMT -4. The time now is 05:44 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.

Copyright © 2006 - 2012 Zealot Forums | About Zealot Forums | Advertisers | Investors | Legal | A member of the Crowdgather Forum Community